NSMT
Macro photograph of tungsten metal powder and tungsten carbide granules

Our Platform

Five material platforms, one integrated value chain

NSMT is building one of the world's most integrated strategic materials platforms — each stage adding purity, complexity and margin.

Core platform

Tungsten

  1. 01APT
  2. 02Metal Powder
  3. 03Carbides
  4. 04High-Performance Powders
  5. 05Electronic-Grade Materials
  6. 06Semiconductor Precursors

Core platform

Molybdenum

  1. 01APM
  2. 02High-Purity Oxides
  3. 03Powders
  4. 04Catalyst Materials
  5. 05High-Temperature Materials
  6. 06Advanced Chemicals

Roadmap

Rare Earth Platform

  1. 01Heavy Rare Earths
  2. 02Magnet Materials
  3. 03Permanent Magnet Supply Chain

Iron · Manganese · Phosphate · Fluorine

Battery Materials

  1. 01Battery Precursor Chemicals

Bismuth · Rhenium · Tellurium · Selenium

Advanced Materials

  1. 01Functional Materials
  2. 02High-Performance Compounds
  3. 03Advanced Industrial Applications

Koktenkol — life-of-mine output

185,970 t

Tungsten

458,207 t

Molybdenum

308,319 t

Copper

51,367 t

Bismuth

55 yrs

Mine life

Rare Earth and Battery Materials reflect NSMT's broader platform roadmap.

Strategy

A phased build-out — from first tungsten production to a fully integrated platform

Phase I — Initial production

Capacity
5,000 tpa APT · ~200 tpa APM · ~1,500 tpa Cu
Stage 1 capex
~US$580M total (5.0 Mtpa case); ~US$181M start-up complex to first production
Financing
US$72M committed (ADCB US$42M + Traxys US$30M); ADCB HQ facility up to US$200M in negotiation; US$308M balance to be arranged
EPC contractor
NFC — China Nonferrous Metal Industry's Foreign Engineering & Construction, signed July 2026
Offtake
Traxys — up to 70% take-or-pay + up to US$300M further funding + US$30M advance facility
First APT
2028, with Stages 1.2 and 1.3 expanding through 2029

Phase II — Full-scale platform

Capacity
20,000 tpa APT · 18,000 tpa APM · 8,000 tpa Cu
Capex
~US$2.66bn — Stage 2 molybdenum operation at 20 Mtpa
Economics
NPV at 10% US$1,516M · IRR 30% (JORC PFS)
Financing
To be arranged, building on the Phase I ADCB relationship
EPC contractor
To be confirmed following Phase I execution
Offtake
To be arranged, building on the Phase I Traxys relationship
Phase I / II ProductionAdvanced ChemicalsAdvanced MaterialsElectronics MaterialsStrategic Materials Platform

Phase I targets 5,000 tpa APT; PFS Stage 1 averages 16,416 tpa across its 14-year life. Figures per the JORC Pre-Feasibility Study, amended 7 June 2025, on a price deck of US$331/mtu APT.