NSMT
Industrial hydrometallurgy plant with stainless steel leaching tanks

Why Hydrometallurgy

High purity, in fewer steps

NSMT's hydrometallurgical process delivers high-purity intermediate products in fewer steps than conventional routes — the structural advantage behind the platform's economics.

01

Fewer Purification Stages

Fewer steps between ore and market-ready product.

02

Lower Cost

A streamlined flowsheet reduces cost per unit of output.

03

Higher Quality

Consistent, high-purity intermediates from the outset.

04

Easier Transition to High-Margin Products

A direct path into advanced chemicals and materials.

Flagship project unit economics

Stage 1 — Tungsten Heap Leaching

US$4.30 / kg W

Capital intensity

US$19.09 / kg W

Average cash operating cost

Preliminary economics per current technical-economic assessment; tungsten pricing per Argus market reporting.

Scalable platform

Each new processing stage increases value, diversification and resilience

Stage 1

Tungsten Heap Leaching

14 yrs

Stage life

Stage 2

Molybdenite Flotation and Roasting

47 yrs

Stage life

Stage 2A

Scheelite / Skarn Flotation and Tank Leaching

19 yrs

Stage life

Added Value

Diversification

Business Resilience

Potential Returns